Our Project
Product website
Group members
Edvin Walleborn, Patrik Zhong, Alexander Carlsson, Johanna Jansson, Jing Li, Rasmus Hammer, Erik Blondell, Johan Engström, Celine Mileikowsky
Definition of done
When is a story done?
It should be tested with the pre-conditions and fulfill the post-conditions. There should be no unaccepted bugs (There are acceptable ones :) Check with team/product owner). All tasks regarding the story should be integrated.
When is a task done?
Tasks should be tested by at least one other group than the group working on the task. A task should be able to be integrated with other tasks in the same story. There should be no unaccepted task-specific bugs.
Sprints
Sprint 1
Lists of stories(Sprint Backlog)
1. Gathering and storing data
2. Create the graph
3. Graphical interface
4. A list of
requirements
5. Interactive graphics
6. Improving website's GUI
Sprint Goal
Be done with prerequisites for implementing the graphical interface
Demo Date
Friday 2020-04-20, 08.30-10.00
Daily Scrums
08.00-08.15 every morning
Sprint 2
Lists of stories(Sprint Backlog)
1. Implement searching for a coursename instead of a courseID
2. Separate between recommended and required courses and then handle them differently in the graph
3. Create a name for our application
4. Use lookup output to build node, integration story "fetching" and story "graph"
5. Write the CSS and HTML for the mock-up website design
6. Improve website Graphical User Interface
7. Improve graphics
Sprint Goal
Have a working prototype of the entire product
Stories we actually did
1. Implement searching for a coursename instead of a courseID
3. Create a name for our application
4. Use lookup output to build node, integration story "fetching" and story "graph"
5. Write the CSS and HTML for the mock-up website design
6. Improve website Graphical User Interface
7. Improve graphics
Demo date
Monday 2020-05-04
Daily Scrums
08.00-08.15 every morning
Sprint 3
Lists of stories(Sprint Backlog)
1. Design loadingpage and integrate with website
2. Handle required equivalent courses
3. Implement course-period into graph
Sprint Goal
Be done with version 1 of product
Stories we actually did
1. Design loadingpage and integrate with website
2. Handle required equivalent courses
3. Implement course-period into graph
Demo Date
Monday 2020-05-11
Daily Scrums
08.00-08.15 every morning
Sprint 4
Lists of stories(Sprint Backlog)
1. Add loading screen to buttonpage
2. Refactor HTML and CSS
3. Add supported courses to helppage
4. Fix footer
5. Change coursecodes in prereq list to always have uppercase letters
Sprint Goal
Be done with final fixes for version 1.1
Stories we actually did
1. Add loading screen to buttonpage
2. Refactor HTML and CSS
3. Add supported courses to helppage
4. Fix footer
5. Change coursecodes in prereq list to always have uppercase letters
Demo Date
Monday 2020-05-18
Daily Scrums
08.00-08.15 every morning